The person you met last month may have a different priority today. A briefing that repeats the old story can make you sound less prepared than you are.
The change
Relationship memory has a routine refresh path, with replies and meetings able to trigger earlier updates. Refreshes are controlled rather than running every time you open a record.
The purpose is to carry new context into later work: a changed priority, an agreed follow-up or a concern that was not present in the last summary.
Put it to work
After a meaningful conversation, open the person’s record and inspect the saved history. Check that the new information is present and that older assumptions have not become facts by repetition.
Use the available history refresh control when a refresh is needed. If the source conversation is missing, bring that context into Nynch before expecting a better summary.
Why it is useful
Your next message can build on the conversation you just had. That matters more than having a perfectly polished summary of a relationship as it stood three months ago.
Memory is still something to review. When you correct it, make the correction specific enough to improve the next piece of prepared work.
Connect the updated memory to a useful action
After checking the saved context, prepare one real next step: a meeting brief, a reply or a question for the next call. Look for the change you expected in that output.
If the memory says the buyer is waiting for a board decision, the draft should not assume approval has already happened. Save a specific correction through the record or Today feedback, then inspect the next piece of preparation.
